FABRICATION & QC

ZR complies with ASME codes for quality control of raw material, manufacture and inspection during the whole process in traceable mode. ZR performs the welding on pressured seams strictly following the requirements of WPS applied, and the finish of the wetted part of built equipment is strictly complied with the sanitary requirements.

ZR can manufacture the pressured vessel complied with PED and AS1210 codes, with public-recognized inspection body to issue CE certificate, or to certify and stamp MDR with full set of quality control documents for AS1210 pressure vessel installation registration in Australian authorities